State officials accelerate timeline for Route 8 temporary bridge in Clarksburg
· mitchell chapman; the berkshire eagle
Source Summary
Following a bridge inspection, the state Department of Transportation has accelerated plans for the installation of a temporary bridge on Route 8 over the Hoosic River, with the goal of having the structure in place before Columbus Day weekend.
Advertisement