Andina Copper Intersects 292m at 0.48% Cu from 44m
· financialcontent
AI Briefing
- Andina Copper Corporation reports 292m of 0.48% Cu from 44m at Cobrasco Project.
- Second hole from new step-out drill pad at Cobrasco Project.
- Drill results indicate promising copper mineralization at the project site.
Advertisement